Process
Discovery to Warranty
Eight stages, each with a deliverable you can hold and a cost model you can act on. Nothing moves forward until the previous stage is genuinely resolved.
01
45 minutes
Discovery
A conversation about the house, the way you use it, your timing, and an honest investment band. If the fit is wrong, we say so and point you toward a studio better suited to the work.
Deliverable
Written fit summary and preliminary investment band
02
3 – 5 weeks
Site & Feasibility Study
Measured survey, structural walk-through, zoning and coastal-code review, and a first read on what the property will allow. Constraints get named before they become surprises.
Deliverable
Existing-conditions set, constraints memo, order-of-magnitude budget
03
4 – 7 weeks
Concept Design
Two or three planning directions explored in plan, massing, and section, each with a cost model attached. We meet, we argue productively, and one direction is chosen.
Deliverable
Concept plans, massing studies, comparative cost models
04
8 – 14 weeks
Design Development
The chosen direction is resolved: dimensioned plans, elevations, millwork drawings, lighting, and the material palette selected in real samples under real daylight.
Deliverable
Developed drawing set, material palette, specification schedule
05
8 – 16 weeks
Preconstruction & Permitting
Construction documents, engineering, subcontractor pricing, and permit submission. Allowances are converted into selected, priced items so the agreement reflects actual scope.
Deliverable
Permit set, line-item construction agreement, build schedule
06
6 – 16 months
Construction
One project lead and one site superintendent stay with your house from demolition to final trim. Weekly site notes, a live schedule, and a walk-through at whatever cadence suits you.
Deliverable
Weekly progress notes, open-book change logs, live schedule
07
3 – 5 weeks
Completion & Handover
Punch list cleared before final payment, systems commissioned and demonstrated, and the house professionally cleaned and photographed before you move back in.
Deliverable
Commissioning walkthrough, home manual, finish and warranty binder
08
Two years, then annually
Warranty & Care
Scheduled check-ins at month two and month eleven while the house moves through a full seasonal cycle, plus a standing line for anything that needs attention afterward.
Deliverable
Two-year workmanship warranty and annual care visits
Investment guidance
Final scope determines cost
$150,000 – $300,000
Kitchen transformation, or a single-room addition with modest structural work.
$300,000 – $700,000
Guest wing or primary-suite addition; multi-room renovation with envelope work.
$700,000 – $1.5M
Coastal renovation with envelope replacement, or a partial whole-home reorganisation.
$1.5M and above
Whole-home renovation with structural reorganisation, new systems, and site work.